What we do

Challenge

This project entailed the transport and installation of the P11 Gas Production facility with the HLJV 'Innovation'. Piles, jacket and topside were taken on deck of the HLJV and transported to site, located 55 km north west of Rotterdam. The P11E platform is a Standard Satellite Platform of Oranje-Nassau Energie, which is designed as a generic modular processing facility and can produce 2MMN m3/day of natural gas. On the P11E platform, produced water is separated from the gas and condensate and disposed of overboard. The produced gas and condensate will be exported via an 8” pipeline to the P15D platform, where the gas and condensate will be treated to further transport quality.

Solution

Our installation scope includes the following activities:

  • Removal of the conductor dome with DSV Glomar Vantage
  • Upending of the jacket in the port of Rotterdam with sheerlegs Matador, Matador 2 and Matador 3
  • Transport of jacket, topside and piles on deck of the HLJV
  • Lifting the 600 tonnes jacket onto the seabed over the pre-installed conductor
  • Installing the four 110 tonnes piles into the jacket sleeves
  • Levelling the jacket and swaging the piles
  • Installing the topside  onto the jacket

Related jobs